Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 12 results ...

Alarcón, L F and Ashley, D B (1996) Modeling Project Performance for Decision Making . Journal of Construction Engineering and Management, 122(03), 265–73.

Gibson, G E, McGinnis, C I, Flanigan, W S and Wood, J E (1996) Constructability in Public Sector . Journal of Construction Engineering and Management, 122(03), 274–80.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1996)122:3(274)
  • Abstract:
    Constructability is defined as the optimum use of construction knowledge and experience in planning, design, procurement, and field operations to achieve overall project objectives. It should ideally be started early in the conceptual design phase of a project. Public sector owners, such as the U.S. Army Corps of Engineers, have difficulty accessing private construction expertise early in a project life cycle due to Federal Acquisition Regulations. This paper outlines a case study using a contractor symposium to enhance constructability during early detailed design on a project in Texas. It briefly describes the Sargent Beach erosion control project on which the constructability symposium technique was used. It then discusses the symposium process including its applicability, mechanics, and important considerations. The article then discusses the status of the project including actions taken as a result of the symposium. It concludes with a discussion of benefits, problems, and recommendations concerning this innovative technique.

Gransberg, D D (1996) Optimizing Haul Unit Size and Number Based on Loading Facility Characteristics . Journal of Construction Engineering and Management, 122(03), 248–53.

Hartman, F and Snelgrove, P (1996) Risk Allocation in Lump-Sum Contracts—Concept of Latent Dispute . Journal of Construction Engineering and Management, 122(03), 291–6.

Hastak, M, Halpin, D W and Vanegas, J (1996) COMPASS—New Paradigm for Project Cost Control Strategy and Planning . Journal of Construction Engineering and Management, 122(03), 254–64.

Ioannou, P G and Martinez, J C (1996) Comparison of Construction Alternatives Using Matched Simulation Experiments . Journal of Construction Engineering and Management, 122(03), 231–41.

Lin, K and Haas, C T (1996) An Interactive Planning Environment for Critical Operations . Journal of Construction Engineering and Management, 122(03), 212–22.

Samuels, A F and Bruder, M J (1996) Construction Representative: Scheduling and Cost Management . Journal of Construction Engineering and Management, 122(03), 281–90.

Shohet, I M and Laufer, A (1996) Exterior Cladding Methods: A Technoeconomic Analysis . Journal of Construction Engineering and Management, 122(03), 242–7.

Stager, D K (1996) Organizing and Managing a Finance-Design-Build Project in Turkey: Fourth Roebling Lecture, 1995 . Journal of Construction Engineering and Management, 122(03), 199–204.

Tiong, R L K (1996) CSFs in Competitive Tendering and Negotiation Model for BOT Projects . Journal of Construction Engineering and Management, 122(03), 205–11.

Walker, K K, Schexnayder, C, Mayo, R E and Walsh, K D (1996) Methods and Procedural Considerations in Demolishing Tall Concrete Chimneys . Journal of Construction Engineering and Management, 122(03), 223–30.